Why Xinqi Hygiene
Belongs On Your Shortlist.
Factory evidence buyers can verify before sampling. Granulation, extrusion, printing, rewinding and slitting all run on one sealed campus in Hui’an, Fujian — with an in-house laboratory and the certificates your compliance team will ask for.
Start With The Supplier Risk You Need To Remove.
A shortlist is not built from slogans. It is built by removing one risk at a time: factory identity, repeat quality, compliance approval, capacity fit, export handoff and response speed. Pick the risk that is holding your review up.
Direct factory review before price comparison
The first question in every supplier review is whether the order is made by the company quoting it. Xinqi is a manufacturer, and the production route can be walked rather than described.
- Granulation, extrusion, printing, rewinding and slitting run on one 92-mu sealed campus in Hui’an, Quanzhou, Fujian.
- 12 film lines and 17 printing presses are installed on site, and no step in the route is subcontracted.
- Buyers are welcome to audit the plant, the laboratory and the warehouses before an order is placed.
A first sample proves nothing if batch ten moves
Quality drift is the risk that hurts most after approval, because it appears months later on a running converting line. Xinqi controls the three variables that usually move.
- Formulation is fixed in-house: three granulation lines compound the calcium carbonate and imported polyethylene on site.
- Eight inspection gates carry every batch from incoming material to released roll, with inline defect detection on 8 of the 12 rewinders.
- Every batch is tested in our own laboratory and a sealed retained sample is stored for traceability.
Compliance approval is a document problem, not a price problem
A quotation can be competitive and still stop at the compliance desk. The certificates a hygiene buyer needs already exist here, with the year each was granted.
- ISO 9001 quality management since 2017, and ISO 14001 and ISO 45001 environment and safety since 2021.
- OEKO-TEX STANDARD 100 certified in 2026, and recognised as a National High-Tech Enterprise in 2022, renewed in 2025.
- 28 granted patents support the process development behind the film and print routes.
Capacity only matters if it fits your specification route
A capacity figure is only useful when it maps onto the film route you actually buy. The installed equipment here answers the volume question and the specification question at the same time.
- 12 film lines, five cast and seven microporous breathable, so one line stop does not stop your order.
- 17 printing presses, thirteen flexographic and four gravure, so print is not the bottleneck when artwork changes.
- 20,000 tonnes of annual capacity reached in 2024, plus a new breathable line and blown film line adding 6,500 tonnes in 2026.
The handoff between factory and port is where orders stall
Film that passes outgoing inspection can still be held at customs for a missing declaration. Export paperwork is treated here as part of production, not as an afterthought.
- Finished rolls are held in our own goods warehouse and released only after outgoing inspection.
- Every order ships with a commercial invoice, packing list, bill of lading and certificate of origin.
- A certificate of analysis for the production batch and any third-party test report can be enclosed or emailed in advance.
A technical question should reach the people who run the lines
Slow or relayed answers are a supplier risk of their own. Here the account manager and the technical contact both sit with the plant, not with an intermediary.
- 210 people work on site and 130 of them are technical: extrusion operators, print technicians, laboratory analysts and quality engineers.
- One account manager and one technical contact carry your file, so questions are not re-explained each time.
- Specification questions, print trials and sampling requests are answered by the team that runs the equipment.
One Factory Controls The Route From Pellet To Finished Roll.
Five stages, one site, one quality system. Each stage below names the evidence you can ask for before you accept a quotation.

Material preparation
Three granulation lines compound calcium carbonate and imported polyethylene on site, weighed by loss-in-weight scales accurate to 0.5 percent, so the masterbatch and the colour are set before extrusion begins.
Ask for: the compound formulation and the colour route for your film.

Formação de película
Five cast lines and seven microporous breathable lines run under one roof, with French SCANTECH thickness scanners and JCTIMES automatic die heads holding gauge across the full web width.
Ask for: the line that will run your specification and its thickness tolerance.

Printing route
Thirteen satellite flexographic and four gravure presses print at up to 500 m/min with 8-colour registration and inline defect detection on every press, using food-grade water-based ink.
Ask for: the print trial and the ink route for skin-contact material.

Roll conversion
Thirteen slitters and twelve rewinders finish the roll with edge correction and static elimination, and eight of the rewinders carry high-precision defect detection.
Ask for: roll width, winding tension and packing readiness.

Warehouse release
Finished rolls are held in the goods warehouse and released only after outgoing inspection, so nothing ships on assumption.
Ask for: the release record before the container is loaded.
Repeat Orders Need A Stable Process, Not A Lucky First Sample.
Approving a supplier on one good sample is the most expensive mistake in film sourcing, because the failure appears months later on a running line. Three variables decide whether batch ten behaves like batch one.
Formulation control
The compound is granulated on our own three lines, so the calcium carbonate, the polyethylene and the colour are the same on repeat order ten as on order one.
Machine control
Breathable film, cast film, printing and slitting each run on dedicated equipment with inline measurement, so a repeat order is not re-learned from scratch.
Measurement control
Twelve laboratory instruments test every batch, all devices are externally calibrated once a year, and a sealed sample of each batch is retained for re-testing.



Approval Files Should Be Ready Before The First Shipment.
Procurement, QA and compliance rarely ask for the same document. This index shows which file answers which internal question, and where that file comes from.
| Document | The internal question it answers | Where it lives |
|---|---|---|
| Certificate copies | Supplier approval and the compliance file: ISO 9001, ISO 14001, ISO 45001 and OEKO-TEX STANDARD 100, with their scope. | Certifications centre |
| Certificate of analysis | Quality release and incoming inspection: batch test data for the roll that actually shipped. | Quality control |
| Quality system records | Supplier audit and corrective action review: 6M documentation and the inspection record for each production stage. | Quality control |
| Factory audit file | Pre-approval factory visit: certification originals, in-house laboratory records and process documentation. | About Xinqi |
| Export document set | Customs clearance and destination delivery: commercial invoice, packing list, certificate of origin and bill of lading. | Contact and RFQ |
- ManThree-level training, plus job certification for key positions.
- MachineDaily equipment maintenance, with verification of new equipment and fixtures.
- MaterialIncoming inspection specification and a trial run for every new material.
- MethodSOP and SIP, first-article control, and a written exception-handling process.
- EnvironmentTemperature and humidity control in the printing and special workshops.
- MeasurementRegular verification, with annual third-party calibration of every instrument.
View certificateISO 9001 Quality Management System
First granted in 2017 and maintained through annual surveillance audits, covering breathable film and nonwoven composite film production.
View certificateISO 14001 Environmental Management System
Environmental management covering the Hui’an production campus, first certified in 2021 and maintained through annual surveillance audits.
View certificateISO 45001 Occupational Health and Safety Management System
Occupational health and safety management across the plant, first certified in 2021 and re-issued on the same audit cycle as ISO 14001.
View certificateNORMA OEKO-TEX 100
Certification for skin-contact textile materials, granted in 2026. For hygiene products this is the certificate a European and North American compliance team looks for first.
Capacity Matters Only When It Fits Your Specification Route.
20,000 tonnes of annual capacity is only meaningful next to the route you buy. Here is what each part of the installed equipment actually removes from your order.



Ask For Proof That Helps Procurement, QA And Compliance Decide.
Copy this list into your first email. It is written as the six items that let three different internal teams sign off on the same supplier.
- 01Factory identity
Business licence, plant address in Hui’an, Quanzhou, Fujian, and the route for a one-day factory audit.
- 02Sample data
Specification sheet and test data for the grammage, width and print you are actually buying.
- 03Batch certificate of analysis
The COA for the production batch, with the in-house laboratory results behind it.
- 04Certificate scope
ISO 9001, ISO 14001, ISO 45001 and OEKO-TEX STANDARD 100 copies, checked against your material and market.
- 05Export document set
Commercial invoice, packing list, certificate of origin and bill of lading, reviewed by your customs broker.
- 06Capacity confirmation
Line allocation and lead time for your annual volume and repeat specification.
Procurement checks the price and the risk, QA checks the batch data, and compliance checks the certificates and the declarations. A supplier who can answer all three in one reply is a supplier who can be shortlisted without another round of questions.
Follow The Evidence Route That Matches Your Concern.
This page is a starting point, not the whole file. Each concern below has a page that carries the detail, so the review can move forward instead of stopping here.
| Your concern | Next page | What you will find there |
|---|---|---|
| Factory identity | About Xinqi | Campus, production lines, capacity, milestones and the route for a factory audit. |
| Product fit | Produtos | Breathable film, cast film, backsheet, lamination, composite film and printed film routes. |
| Application fit | Soluções | Film selection for baby care, feminine care, adult care and medical disposables. |
| Quality proof | Quality control | Inspection gates, the in-house laboratory, batch testing and complaint handling. |
| Compliance proof | Certificações | ISO 9001, ISO 14001, ISO 45001, OEKO-TEX STANDARD 100, patents and audit files. |
| RFQ action | Contacto | How to send a specification, request samples and ask for the document pack. |
Supplier Review Questions Before Sampling.
The questions that decide whether a supplier moves from research into a sample request. Product specification questions are answered on the product pages.
Turn Supplier Confidence Into A Reviewable RFQ.
Send one short review brief and the reply comes back with the right production route, sample path, quality proof and document support. No form to fill in — just the eight lines below.
